Silicon Valley Clean Water | Front of Plant (FoP)
Electrical design-assist, power distribution, and full instrumentation and controls for the Front of Plant project, including a 90-foot-deep Receiving Lift Station supporting critical wastewater opera
Details
Description
The Silicon Valley Clean Water, Front of Plant (FoP) is a Design-Assist Project that required complex electrical, instrumentation, and controls systems to support construction, startup, commissioning, and closeout of major wastewater facility. Our scope included design-assist electrical services, power distribution, and full instrumentation and controls integration for the Receiving Lift Station (RLS), headworks, odor control systems, chemical offload facilities, influent connector piping, emergency overflow systems, and supporting process infrastructure.
The RLS features a 90-foot-deep, 60-foot-diameter shaft housing critical electrical, control, and monitoring systems, demanding precise coordination, constructability-driven design, and rigorous commissioning to support safe, reliable, and continuous plant operations.
Market Sectors
Got Questions?


